Home / Project Cases
Get a quoate

    Project Cases

    • Why Indian Clients Trust Boben Panels for Modular Cleanrooms?

      In the pharmaceutical and precision electronics industries, cleanroom walls are more than mere barriers—they serve as the final line of defense against contamination. Recently, a delegation from a renowned pharmaceutical engineering general contractor in Mumbai, India, traveled 4,000 kilometers specifically to visit the Boben factory. Their objective was clear: to source the highest-quality “skeleton” and…
      Read More
    • Dubai Client Clean Booth Project

      BOBEN’s Latest Clean Booth Project Delivery. This project employs a modular prefabricated design, enabling rapid on-site assembly within an extremely short timeline while delivering a stable clean environment through an efficient HEPA filtration system.
      Read More
    • Customized Modular Cleanroom Systems for the Electronics Assembly Industry Exported to the UAE

      The client had two core requirements: First, it had to be energy-efficient—after all, indoor cooling energy consumption is high during UAE summers, and a high-efficiency design would help them reduce operational costs. Second, on-site assembly needed to be hassle-free, as their production launch timeline was tight and they didn’t want to spend too much time on installation.
      Read More
    • A Small Modular Cleanroom Medical Equipment Calibration Laboratory in Jeddah, Saudi Arabia

      This is a case study of a small modular cleanroom medical equipment calibration laboratory in Jeddah, Saudi Arabia. The client specializes in precision calibration but lacked space for new calibration equipment. They repurposed a storage room adjacent to their clinic into a cleanroom. However, the storage room measured 8m long × 5m wide with a…
      Read More
    • Modular Cleanroom for a Precision Factory in Riyadh, Saudi Arabia – Boben Built in 7 Days

      This project involved a small factory in Riyadh, Saudi Arabia, specializing in precision optical components. The client needed a cleanroom to test high-accuracy lenses, but excessive reflections from the walls in their existing workshop skewed their data. They also had to pass the Saudi SASO Modular cleanroom Certification, and the deadline was extremely tight: they…
      Read More
    • Singapore Testing Laboratory Clean Booth Case Study: Temporary Clean Zone Erected in 3 Days

      This is a real-world clean booth project for a small COVID-19 residue testing lab in Singapore: After securing community screening contracts, the client faced insufficient clean area capacity. Located in an aging downtown office building, the lab could not alter existing finishes while still meeting Singapore’s SS 536 cleanliness standards—all within a four-day timeline. The…
      Read More
    • Dubai Reagent Factory Cleanroom Case Study: ISO Class 7 Production Space Commissioned in 7 Days

      This is a recently completed project for a local Dubai client—a small manufacturer of sterile diagnostic reagents. They leased an unused section of an industrial facility in the city center and urgently needed to ramp up production ahead of the local medical procurement season. However, since the space was rented, they couldn’t undertake any construction…
      Read More
    • Ultrasonic instrument industry ISO8 cleanroom

      Project Overview: Clean Upgrade of Precision Manufacturing Customer Industry Ultrasonic Instrument Manufacturing Application requirements Precision assembly, debugging, and packaging of ultrasonic transducers and core circuit boards Cleanliness level ISO 8 (Class 100000) Key configurations modular clean room, efficient FFU system, integrated air shower device Project Challenge Need to deploy quickly within existing R&D/production areas without…
      Read More